IV .Technical Parameter
Model
Coil master
Coil width
700 ~ 1778mm
Coil OD
1100 ~ 2200mm
Coil ID
>457mmm
Coil weight
1000-26000kg
Packing material
PE/LLDPE stretch film/PVC
ID:76mm  
OD:100-250mm   
Width:250mm
Shutter speed
app.2-3m/sec
Overlap rate
20% ~ 90%
Power output
app 23KW
Power voltage
480V, 3 phase, 60 Hz
Air supply
6~8kgf /cm2

V. Machine Installation
1. This automatic coil packing machine system is composed of blocker roller stations,
guide rail, main machine, trolley, hydraulic system, shuttle, packing material release & storage station, U-type orbital, automatic mechanical hand, signal detection system, electric circuit system, electric cabinet and etc.
2. The machine shall be mounted in dry and dust free environment.
3. The machine shall be mounted on flat and hard ground, where the ground
load should be more than 10t/ m2.
4.     Power supply should be in accord with states in the nameplate of the
machine.
5.     Only trained personnel can be allowed to enter the installation site.
6.     The entire installation shall be done under the power supply is cut off.
7.     As the machine has been transported and moved, all flexible components
shall be inspected carefully.
8.     Install the guide rail as the design drawing on the ground horizontally,
then place trolley on guide rail to make sure the trolley can moved smoothly.
9.     Put main engine/machine in the trolley, machine should be perpendicular
to the trolley.
10.  Install the U-type orbital and shuttle as the design drawing.
11.  Install the hydraulic station and relevant pipelines.
12.  Place three blocker roller stations, electric wire trunking, signal
detection coil packaging machine system in correct positions according to the drawing.
13.  Connect and check electric circuit system well as the electric diagram.
14.  Connect the power supply after installation complete.
15.  Move the main coil packaging machine to three blocker roller stations in separate
in “Manual” mode and check their signals.
16.  Calibrate the three blocker roller stations according to the stop positions
of the main engine/machine.
17.  Operate each operation in “Manual” mode. After confirming there is no
problem, operating them again in “Auto” mode.